Road Kerbs

From KSh 450 / piece

Supply only · priced per piece · excludes VAT at 16% and delivery

  • Precast concrete road kerbs, 915 x 125 x 255 mm, about 65 kg each
  • Straight, corner or radius, splayed or half-battered and channel profiles
  • Straight kerbs ex-stock; corners, specials and large runs in 3 to 5 working days
  • Minimum order 20 pieces; about 250 kerbstones to a lorry load
  • Run length in metres divided by 0.9 gives the number of kerbstones

Configure this product

kerbstone

Minimum 1 kerbstone, in steps of 1.

How many do I need?

Run length in metres divided by 0.9 gives the number of kerbstones.

Allow 5 to 10 per cent extra for cuts and breakages.

Rate KSh 450 / piece
Estimated total KSh 450

Indicative, excluding VAT at 16% and delivery. A formal quotation confirms both.

piece

Lead time: Straight kerbs in stock; corners, specials and large runs in 3 to 5 working days.

Order on WhatsApp

About this product

What road kerbs are used for

Precast kerbstones that edge and retain paving, driveways and roads while directing surface water. Cast to consistent profiles for a clean, durable line.

Typical applications are roads, driveways and estate developments. Kerbs are also used to restrain the edge of a cabro driveway, which is what stops the blocks creeping outwards under traffic.

Specifications

Size 915 x 125 x 255 mm (915 mm nominal length)
Weight about 65 kg per kerbstone
Profiles Straight / Corner or radius / Splayed or half-battered / Channel
Finish Grey, off-form
Pieces per tonne about 15
Pieces per lorry load about 250
Minimum order 20 pieces
Sold by the kerbstone
Dimensions 915 × 125 × 255 mm
Typical applications Roads / Driveways / Estates
Availability Ex-stock (straights)
Lead time Straight kerbs in stock; corners, specials and large runs in 3 to 5 working days.

Options

Profile Straight, Corner or radius, Splayed or half-battered, Channel

Pricing

Price KSh 450 per kerbstone
As recorded KSh 450
VAT Added at 16% on top of the price shown
Delivery Quoted separately by load and destination

How many kerbstones you need

Run length in metres divided by 0.9 gives the number of kerbstones. A 40 metre driveway edge works out at about 45 kerbstones.

Allow a margin for cuts at corners and for breakages in handling.

Laying and installation

Kerbs are bedded and haunched on a concrete foundation to a string line. Available supply-only, or supply and lay by our own team.

Delivery and lead times

Straight kerbs are held in stock. Corners, specials and large runs take 3 to 5 working days. Collection from the Ngong yard or delivery by the load.

Common questions

How many kerbstones are in a metre?

A Preco kerbstone is 915 mm long, so a metre of run takes about 1.1 kerbstones. Divide your run length in metres by 0.9 to get the count.

Can road kerbs be used to edge a cabro driveway?

Yes. An edge restraint is what keeps laid cabro from spreading under traffic, and a kerb bedded on concrete is the usual way to provide it.